1 |
WOQOD, Qatar |
Asset Integrity WOQOD Facilities & Operational areas |
Consultancy Services for the Development of Maintenance database for Mechanical, Electrical, Instrumentation, fire and Gas, HVAC facilities at various WOQOD Facilities & Operations areas. Scope of works includes the following
a) Preparation of Asset Registry Templates
b) Preparation of BOM
c) Preparation of SPIR templates
d) Preparation of Maintenance Plan
e) Preparation of Maintenance Craft Procedures ( MCP) |
2 |
Qatar Petroleum |
Data Acquisition and RBI Analysis, Dukhan Fields |
Consultancy Services for Asset Integrity and RBI analysis for Dukhan Gas Plant. Scope of work includes the following Preparation of Asset Register
a) Carryout RBI Study
b) Carryout corrosion study
c) Preparation of Maintenance Plan
d) Preparation of inspection drawings and isometrics
e) Base line inspection |
3 |
Qatar Petroleum |
Risk Based Inspection and Data Population for Piping Integrity Management |
Consultancy Services for Asset Integrity and RBI analysis for Maiseed NGL Plant. Scope of work includes the following
a) Preparation of Asset Register
b) Carryout RBI Study
c) Carryout corrosion study
d) Preparation of Maintenance Plan
e) Base line inspection |
4 |
WOQOD, Qatar |
Consultancy Services for the Asset physical verification, Qualification & Quantification for WOQOD |
Assets Physical Verification, Classification, Categorization & Documentation
Development of Asset Registry templates creation/modification for all disciplines (Mechanical, Electrical & Instrumentation)
Conducting site survey and checks and confirm the name plate details like make and model, serial numbers are matching with the available data sheets/ drawing for Equipment and Sub equipment |
5 |
WOQOD, Qatar |
RBI Study for Operational Sites of WOQOD |
Consultancy Services for RBI study inclduing the following
a) Data Collection
b) Review of Data for Static Equipments and Piping items
c) Development of Corrosion Loops / Circuits
d) Corrosion Study
e) RBI Data Population
f) Risk Analysis
g) Inspection Planning |
6 |
Qatar Petroleum |
Data Acquisition and RBI Analysis,AGRP |
Consultancy Services for Asset Integrity and RBI analysis for Complete Dhukan Assests. Scope of work includes the following Preparation of Asset Register
a) Carryout RBI Study
b) Carryout corrosion study
c) Preparation of Maintenance Plan
d) Preparation of inspection drawings and isometrics
e) Base line inspection |
7 |
Qatar Petroleum |
RBI Implementation APMS Mechanical Integrity Module in QP various Locations |
Consultancy Services including the following
a) RBI Study and Implementation
b) Data Population in APMS MI data Loader
c) Calculation of minimum required thickness
d) Corrosion Studies with identification of demage mechanisms
e) Validation of NDT data
f) Validation of CMLs
g) Amendment of PIping inspection isometric drawings |
8 |
PDO |
HAZID Services |
HAZID Study for Lean Glycol Filter Installation |
9 |
CCED |
DR /HAZOP |
Design review / HAZOP Services for HSF & EPF Gas Power Project |
10 |
OXY |
HAZID & HAZOP Services |
HAZID & HAZOP Studyu for Wet Land Project |
11 |
PDO |
HAZOP Services |
HAZOP Study for Thuleilat and Qaharir Production Facilities |
12 |
ORPIC |
Design Review and HAZOP |
Design Review and Hozop Study Orpic Refienery |
13 |
PDO |
HAZOP Services |
HAZOP Study for Kauther Gas Lift Project |
14 |
PDO |
HAZOP Services |
HAZOP Study for Kauther PRG Project |
15 |
PDO |
TSE Deliverables |
DEM 1& 2 LFI screening,ALARP,HAZID,VCA,HAZOP< |
16 |
PDO |
DR , HAZID & HAZOP, SIMPOS Services |
DR, HAZID, HAZOP, SIMOPS Study for Saqr West Development Project |
17 |
Hydrocarbon |
HAZOP Training |
HAZOP training course conducting at SAHMAH field of 4 days |
18 |
PDO |
DR , HAZID & HAZOP, SIMPOS Services |
DR, HAZID, HAZOP, SIMOPS Study for Ghanuq Development Project |
19 |
PDO |
HAZID Services |
HAZID Study for Fakr RMS Project |
20 |
PDO |
DR /HAZOP Study |
DR and HAZOP Study for Lakehwir Scale Inhibitor Injection Skid Project |
21 |
PDO |
HAZOP Study |
HAZOP Study for NRPS Project |
22 |
Opric |
HAZOP Study |
HAZOP Services for SBM, Orpic |
23 |
Daleel |
DR & HAZOP Services |
HAZOP Facilitation Services for AP Flare Gas Recovery Project at DPS & BBS, |
24 |
OQ |
HAZOP Services |
HAZOP Workshop Facilitation for RFCC Slurry Filtration System Temperature Control Project |
25 |
Petrogas |
HAZOP Services |
HAZOP workshop facilitation for Installation of steam generation unit for reservoir steaming for Petrogas |
26 |
PDO |
HAZOP Services |
HAZOP for SNGP Condensate &Water Storage FEED Plus |
27 |
ORPIC |
SIMOPS Workshop |
SIMOPS Study - Oman Oil Refineries and Petroleum Industries Company (ORPIC), For Tanks and SBM. |
28 |
Qatar Gas (QG) |
HAZOP Services |
HAZOP workshop facilitation for fEPC of Sru Duiker Burners Replacement At Rl3 - Train 6 & Train 7 Project |
29 |
Qatar Gas (QG) |
HAZOP Services |
HAZOP workshop facilitation for FEED For Barzan ISBL |
30 |
Qatar Petroleum |
HAZOP Services |
HAZOP workshop facilitation , EPIC for upgrade of fire water system at knds and modification to piping supports at Dukhan stations – Qatar Petroleum |
31 |
Qatar Petroleum |
HAZOP Services |
HAZOP workshop facilitation ,EPIC for Hook up of khuff and Arab D wells |
32 |
Qatar Gas (QG) |
HAZID Services |
HAZID Study for Qatar Gas - Epc Services For Sru Duiker Burners Replacement At Rl3 - Train 6 & Train 7 |
33 |
Qatar Gas (QG) |
HAZID Services |
HAZID Study for Qatar Gas FEED For Barzan ISBL |
34 |
Qatar Petroleum |
HAZID Services |
HAZID Study for EPIC for Hook up of khuff and Arab D wells – Qatar Petroleum |
35 |
Qatar Petroleum |
HAZID Services |
HAZID study for Qatar Petroleum- Epic For Groundwater Drainage System In Mesaieed – Phase 2 |
36 |
Qatar Petroleum |
HAZID Services |
HAZID Study for EPIC for upgrade of Fire Water System at KNDS and Modification to piping supports at Dukhan Stations- Qatar Petroleum |
37 |
Qatar Gas (QG) |
HAZID Services |
HAZID Study for EPC for Co2 suppression system replacement by Inergen systems at Qatar Gas Offshore platforms |
38 |
Qatar Petroleum |
HAZID Services |
HAZID Study for Fire Water System Upgradation – Qatar Petroleum Dukhan. |
39 |
Qatar Petroleum |
HAZID Services |
HAZID workshop facilitation: EPIC for Qatar Petroleum Dukhan Produced Water Transfer pumps - |
40 |
Qatar Petroleum |
HAZID Services |
HAZID Study Qatar Petroleum Jaleha Degassing unit upgradation project |
41 |
ORPIC |
HAZID Services |
HAZID/ ENVID Study - Oman Oil Refineries and Petroleum Industries Company (ORPIC), For Tanks and SBM. |
42 |
Chiyoda |
HAZOP |
Chairman Servies for HAZID, HAZOP session - Chiyoda Engg |
43 |
QP |
HAZID |
HAZID Facilitation - Fire Water Network - Dukhan Field |
44 |
Qatar Gas (QG) |
HAZOP Services |
HAZOP Facilitation Services for EPC - connecting HP Sour water from QG2 Slug Catcher to Slug Vessel Project |
45 |
Qatar Petroleum |
SIMOPS Workshop |
SIMOPS Workshop Facilitation: FEED for Berth 6 at MIC area – QP |
46 |
Qatar Petroleum |
SIMOPS Workshop |
SIMOPS Workshop Facilitation: FEED for Berth 6 at MIC area – QP |
47 |
Qatar Petroleum |
SIMOPS Workshop |
SIMOPS workshop for Qatar Petroleum Jaleha Degassing unit upgradation project |
48 |
OQ |
Value Engineering Workshop |
FEED for Fahud Sohar Second Loop Line of 42 size |
49 |
OQ |
HAZID WorkShop |
Gas Supply to Al Namariq Co. Project |
50 |
OQ |
HAZID WorkShop |
Gas Supply to Oman Oil Seeds Crushing Company and Oman Sugar Refinery Company |
51 |
OQ |
HAZID WorkShop |
Gas Supply to GDT |
52 |
OQ |
DR WorkShop |
Gas Supply to Al Namariq Co. Project |
53 |
OQ |
DR WorkShop |
Gas Supply to Oman Oil Seeds Crushing Company and Oman Sugar Refinery Company |
54 |
OQ |
DR WorkShop |
Gas Supply to GDT |
55 |
OQ |
HAZOP Workshop |
Gas Supply to Al Namariq Co. Project |
56 |
OQ |
HAZOP Workshop |
Gas Supply to Oman Oil Seeds Crushing Company and Oman Sugar Refinery Company |
57 |
OQ |
HAZOP Workshop |
Gas Supply to GDT |
58 |
Green Energy Hydrogen & Chemicals |
Material Selection & Corrosion Study for Green Ammonia Project |
Corrosion Study , including Effect of atmospheric corrosion on the steel components, Corrosion Categorization in line with EN ISO 12944-2 , Corrosion mitigation measures, CP, Painting requirements and Material Selection Report for Various Plant Equipments, Piping System |